• Mini Piling contractors London
  • foundation piling london

    khb piling company london

    Why foundation piling is important?

    When you are constructing a building or structure, then you always start by thinking that weather it will be stable or not. Also, you think of the options that you can utilize to make it upright and stable. For this, you can opt for the most stable and reliable structure of the building, which is a pile foundation or the basement piles. It will keep your building very safe and stable while constructing it, and also maintains its posture and overall strength when it is done. It is sure to give these benefits when the foundation under the ground and on the surface is trying enough, and that is done by using the pile’s strategy, just like the foundation piling London.

    This article is all about the pile foundation, what is its importance of using in the manufacturing or construction of buildings, the benefits that it gives you, and much more. So, to learn about all this, you should stay with us. Let’s get started with it now.

    Importance of Getting Foundation Piling
    The pile foundation holds great importance when you are constructing a building. The main point is that it holds the building in a much stronger way than you could otherwise build it. Especially, when the building is vertical, then pile foundations are required to be made. Just like the house extension mini piles, the pile foundations give a strong base of rocks to the building on soil which is weak to hold the weight of the building. You cannot directly build the structure on the soil, and you always need the pile foundation to take it stable, resilient against shakes of an earthquake and all the instabilities that it could face. People also go for the mini piling which is a type of pile foundation done for the houses, but for the huge buildings used for making many floors, the other type of pile foundations are used.

    Benefits of Getting Foundation Piling
    Pile foundation is a very important technique that one must use for building the structures that are not only quite wide but are also very good in height vertically. They need support which you have to provide. Just like the house extension piling, this piling is also very important to be done. Given below are some of its main benefits that you should know.
    They reduce the time to complete the building because you can design the size and shape in advance.
    The bearing capacity of the pile foundation is more when it is below your building than those not having it.
    Even they are great for working over the waters, so try to get it for them too if you are interested.

    Conclusion
    Just like the CFA piling contractors London, and the mini piling contractors that you hire for filling the foundation of your home, you have to hire pile foundation professionals for vertical buildings with multiples floors on them. So, get this opportunity and do it for your building.

    Read more
    piling contractors london

    Foundation piling London

    If you’re planning to construct a big building with a deep foundation, then you’ll need to hire piling contractors in London to do the job right. A superstructure needs to be supported by a stable foundation that is equipped with a strong vertical structural element. These are typically heavy cylindrical posts or stakes which get placed into the foundation. That way, the superstructure on top of it can stay supported. But if you elect to skip the foundation piling process, then it will spell trouble for your structure and the workers that construct it.

    Every pile is a cylinder that’s very long and made from durable material. Most cylinders are made from concrete because this is a strong material that will last for a lengthy amount of time. It is also strong enough to handle most superstructures too. Piling companies in London can recommend the best time to use their piling services. You will not be expected to know this information yourself. Just know that if you’re planning to construct a high rise or big urban building, then you will most likely need piling in London.

    Foundation piling London

    For instance, when you choose a site to build your structure, the piling specialists will come out and analyze the soil on the ground. If the surface has a weak soil layer on it, this indicates that it isn’t strong enough to support the structure’s weight. To resolve this issue, the heavy load of the structure goes through the weak layer and then placed onto a stronger layer underneath the weaker layer. This will be the base of the piling foundation.

    There are two different variations of pile foundations. Foundation piling London. The one chosen will depend on the behavior of the structure. The first type is called end-bearing piles. As described in the example above, this is where the bottom of the pile is placed onto a strong layer underneath a weaker layer. The pile serves as a column for the structure in this case. This is what will keep the structure stable. 

    Friction piles are the second type of piling contractors London. Instead of placing the weight of the load onto a stronger layer underneath the ground, friction piles use the surrounding soil to gather strength. For this reason, friction piles will not go as deep into the ground as end-bearing piles. Because of this, friction piles cannot handle as big of a load as the end bearing piles. The upside is that they’re cheaper and easier to install. If you have an averagely sized structure to build that is not a skyscraper, then you can consider using a friction pile.

    Read more
    Rotary Bored Piling (RBA)

    What are Piles in London?

    If you’re interested in piling contractors in London you should first understand what piles London are. They are basically a long cylinder made from strong materials such as concrete that are then pushed into the ground. They work as a support for a structure to be built on top of. They are able to take much heavier loads than basic spread footing.

    There are two main kinds of piles and both have their own uses. Piling contractors in London are able to help you decide on the right pile foundation to get the job done right.

    End Bearing Piles

    The bottom of an end-bearing pile will be placed on a layer of rock or strong soil. The load from the building is transferred down to this strong layer through the pile. It essentially works as a column does. End bearing piles are installed with the bottom end of the pile resting on the surface between weak and strong layers.
    Friction Piles
    Friction piles work a little differently to their load-bearing cousins. They transfer the load from a building to the soil across the entire pile with the use of friction. It basically means that the cylindrical pile as whole transfers the force rather than just the ends.

    What are Piles Made From? – piling companies London

    Piling contractors in London generally make piles using wood, steel, and concrete.

    Wooden piles would traditionally be used for construction in areas that had weak soil. They are still used today but are mostly used to build jetties. The length of a wooden pile is limited to the length of the tree it is made from. They tend to be around 20 meters long at the most. If you want to see wooden piles in action then just look at Venice, the city which “floats” on wooden piles.

    Concrete piles will be cast beforehand by the company. They are made at ground level and then hammered into the ground as needed. Steel piles are also driven into the ground in this manner. These piles are designed to take heavy loads and save time during the construction process. That is because they are pre-cast and so aren’t made on-site. Concrete piles work best in areas with corrosive soil.

    Contact us today to learn more about piles or arrange for a free consultation about which piles would be best suited for your project.

    Read more
    987

    The Benefits of Driven Foundation Piles

    A driven pile is a long, slender column, which is used to support and resist forces. They are made from preformed materials and have a predetermined shape that can be assessed before installation. They are installed by impact hammering or another method that pushes them into the earth. Here are the benefits of driven foundation piles installed by piling companies London.

    Quality
    A driven pile provides a complete and total engineering solution. Piles are made with a quality assurance process that eliminates guesswork to create reliable, known, and cost-effective product that can be used with a range of different subsurface conditions.

    The driven pile is made from natural materials or pre-manufactured structural shapes to a certain tolerance. They are made from high strength materials and have excellent quality control. A good foundation piling London company will ensure that there piles meet the standards necessary and that there piles are consistent in quality.

    Driven piles will maintain their shape as they are installed. They don’t bulge in soft soil conditions, and they are generally not damaged by installing additional piles. It is possible to inspect hollow-section piles before and after they are installed to ensure their integrity. Solid-section piles can also be inspected to verify their integrity.

    Piling contractors in London are able to model the pile driving process before installation to determine the proper equipment necessary for the job. Static and dynamic testing can be used to confirm the load bearing capacity of an installed pile. Dynamic testing is also used to confirm the hammer is performing properly. Most modern hammers have impact velocity measurement devices installed onto them which offers an excellent degree of quality control.

    Cost-Effective
    Britain piles are typically the most cost-effective deep foundation solution available. You will only ever pay for what you actually need. A piling contractor in London will not add extra costs or expenses for cleaning up the site. It is possible to fabricate that wide variety of materials and shapes of driven piles to make them tough enough to be driven by modern hammers meaning that less piles are needed per project, which results in massive savings on building the foundation of the property.

    The capacity of a pile can be verified easily through static or dynamic pile testing. The capacity of a pile can be optimised to create these act capacity needed (factoring for safety) to further minimise the cost of the foundation. Testing will also eliminate the uncertainty of bearing capacity estimates that static analysis gives. This means that there is no longer a need to be overly conservative, not to mention wasteful, to prevent failure.

    Adaptability
    The adaptability of a driven pile is one of the best benefits. You can choose a specific pile that meets your specific needs, budget, and site conditions. Piles can be made from a range of materials including steel, concrete, and wood.

    Adapt easily to various site conditions to provide a uniform minimum capacity in a reliable way. This eliminates the uncertainty of site variability. Driven piles will be installed to specific criteria, such as a minimum blow count per unit penetration. Driven piles can also be cut off to shorten the length or even spliced to make them longer. Pile shoes, known as points, can be added to help with penetration requirements and create reliable contact with the rock.

    Driven piles also adapt well to the unique conditions and restrictions of the site. They are best used near or with water. There will be no need for special casings nor will there be any delays caused by curing concrete. A pile that has been driven through water can be used immediately, allowing for fast and efficient construction. When it comes to bridges and peers, are driven pile can be quickly incorporated into a bent structure. This allows for the bridge or peer to be used as a work platform.

    There are many more benefits to driven piles than just this. Get in touch to learn more about the benefits of driven piles and arrange a free consultation.

    Read more
    Piling contractors London

    What are Piles and What are they Made of?

    To put it simply, pile essentially a long cylinder made from a strong material which is concrete, that is pushed into the ground and acts as a support for the structure built on top of it.

    Foundation piling London is generally used in the following situations:
    If there is a layer of weeks soil at the surface. This layer is unable to support the weight of the building, so the load weight of the building must bypass this layer and instead be transferred to a layer of stronger soil or rock below the weekly.
    When the building hangs heavy, concentrated loads, such as high-rise structures, water tanks, and bridges.

    Pile foundation is able to take a much heavier load than a regular spread footing.

    There are two fundamental kinds of pile foundation and they both work in their own way. Piling contractors in London can determine the right kind pile foundation for the job based on structural behavior.

    End Bearing Piles
    With end bearing piles, the bottom of the pile rest on a layer of particularly strong soil or rock. The load from the building will be transferred through the pile into the stronger layer. This essentially acts as a column. The key principle of this kind of pile is that the bottom and will rest on the surface between a weak and strong player. The load was therefore bypassed this week layer and will be transferred safely to the strong player.

    Friction Piles
    Friction piles work differently. This kind of pile transfers the load from the building to the soil across the entire height of the pile using friction. This basically means that the entire surface of the pile, which is cylindrical in shape, will transfer the force to the soil.

    You can get a good idea of how this all works by imagining that you are pushing a solid metal rod into frozen ice cream. After pushing the rod in, it is strong enough to support a load. The further the rod is embedded into the ice cream, the bigger the load it can support. This is similar to how friction piles work. With a friction pile installed by a piling contractor in London, how much of the load the pile can support is directly proportional to how long it is.

    What are Piles Made From?
    Piling companies in London will make their piles from wood, concrete, or steel.

    Wooden piles were used as part of traditional construction, to support buildings and areas with weak soil. These days would piles are still used for constructing jetties. The length of the pile is limited to the length of one tree, which is about 20 m, since two tree trunks cannot be joined together. The city of Venice in Italy is famous for being constructed on wooden piles built over seawater.

    Piling companies in London precast concrete piles, making them at ground level, before hammering them into the ground. Steel H-piles can also be driven into the ground. These kinds of piles are able to take on very heavy loads and can save time during construction. This is because there is no need to cast the pile first. The steel is not given a protective coating, as it would be scraped away by the soil. Concrete piles are best used in places with corrosive soil.

    Get in touch today to learn more about piles, and arrange for a free consultation to learn which kind of pile is best for your property.

    Read more
    pile foundation london uk

    How are Piles Constructed and Used?

    Given that pile foundations carry a heavy load, it is up to a foundation piling London company to ensure that they are properly designed and built. Great engineers take the time to study the soil that the pile will be placed in to ensure that it isn’t overloaded beyond what it is naturally able to bear.

    The piles that are placed into the soil have what is called a zone of influence on the soil around. Piling companies must take care to space piles far apart enough that the load will be distributed evenly across all the soil they are in, and that it isn’t concentrated to a few areas. This ensures that neither of the soil, the piles, and the structure is not damaged.

    Engineers typically group several piles together and top them with a pile cap. This power will be a sick Made of concrete that extends over several piles and serves as the base that a column can then be constructed. The load of the column then be distributed evenly to every pile in the group.

    How Do Piling Contractors in London Build Piles?
    A pile can easily cast-in-place or they can be precast. A cast-in-place pile is made by:
    hammering a thin steel tube into the ground
    removing the Earth left inside the tube
    lowering a steel reinforcement cage into the tube
    casting the pile by pouring wet concrete into the tube
    The thin steel tube is known as the casing, and it is used to create a secure mold for casting concrete that is free from any debris and earth. The casing plays no structural role after the casting has been completed.

    Certain soils are highly cohesive, meaning that if someone was to drill a hole into the soil, such as a hole that is 1 foot wide and 50 feet deep, then the soil would hold the shape of the hole and would not collapse into it and block it. If this kind of soil is at the site, then there is no need for a piling company in London to leave the casing in place: the casing can be used to drill the hole for the pile, and then removed, ready for the pile to be cast in place. This saves piling contractor money as they can then use the casing tube to drill the holes for other piles.

    A precast driven pile will be cast at ground level and will then be hammered or driven into the ground with a pile driver. A pile driver is a machine that will hold the pile vertically, and then hammer it into the ground with repeated blows. The blows of stroke by lifting heavy weights and dropping them on top of the pile. The pile will be temporarily covered using steel to prevent it from disintegrating during this process. The pile driver serves two functions. The first of these is that it acts as a crane, to lift the pile from the horizontal position on the ground and rotate into the correct vertical position. The second is that it hammers the pile into the ground.

    A pile must be hammered into the ground until it reaches the point of refusal, which is basically when it cannot be driven any deeper into the soil. At this point, the pile is securely in place and construction can begin.